Hangar-9 Pulse XT 40 ARF User Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
27
Step 4
Build a wiring harness for the batteries using a female
connector and two male connectors. Follow the wiring in
the photo so the motor sees the voltage increase of the
two batteries.
Step 5
Solder the appropriate connectors onto the speed control.
Step 6
Remove the covering from the bottom of the fuselage
as shown to allow for cooling air across the motor
and batteries.
Step 7
Prepare the battery tray by applying two pieces of self
adhesive hook and loop to the battery tray. Start the hook
and loop directly behind the holes in the tray.
Step 8
Position the hook and loop strap into the fuselage. Route
the strap through the fuselage bracing as shown.
Section 7A: Electric Motor Installation
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 39 40

Comments to this Manuals

No comments