Hangar-9 Pulse XT 40 ARF User Manual Page 28

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 27
28
Step 9
Remove the hatch from the bottom of the fuselage. Slide
the battery tray into the fuselage with the hook and loop
facing towards the bottom. The rear of the battery tray
will key into the former. Use two 4-40 x 3/8" socket head
screws to secure the front of the battery tray.
Step 10
Plug the motor into the speed control. Place the mating
half of the self adhesive hook and loop onto each of the
batteries. Secure the batteries using the hook and loop
strap. Plug the speed control into the receiver. Mount the
speed control inside the fuselage so it will not interfere
with the installation and removal of the batteries.
Step 11
Turn on the radio system. Plug the wiring harness
assembled in Step 4 into the batteries and speed control.
Use the throttle on the transmitter to check that everything
is working correctly. Check that the motor is rotating
counterclockwise. If not, follow the directions included
with the speed control to correct the situation.
Step 12
Once the motor is working and rotating in the correct
direction, unplug the wiring harness for safety. Snap the
battery hatch back onto the fuselage.
Step 13
Trim the cowling as necessary to fit over the motor. The
cowl is mounted using four #2 x 1/2" sheet metal screws.
Install the propeller and spinner using the instructions
included with your particular motor.
Section 7A: Electric Motor Installation
Page view 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 39 40

Comments to this Manuals

No comments